A high-fidelity compute module rendered as a sculptural object
CoreX · Sofia · Plovdiv

Europe'ssovereignAIcomputelayer.

Get in touch20-min investor intro
Scroll
Sofia/Plovdiv/25 MW · Phase 1/150 MW grid contracted/Sovereign AI compute/Operational · 6 mo/
Sofia/Plovdiv/25 MW · Phase 1/150 MW grid contracted/Sovereign AI compute/Operational · 6 mo/
01 — The opening

Europe's next compute frontier is already here.

Continental supply

Sofia · Plovdiv → Europe

Sovereign AI compute supplied from the lowest-cost industrial corridor on the continent.

Industrial power economics

A fraction of Western European pricing

Bulgarian grid pricing — the single largest line item in AI infrastructure, sourced where it costs least.

BG
FR
DE
NL
IE
€/MWh
Grid capacity contracted

150 MW on path

Allocation hyperscalers can no longer secure in Frankfurt, Amsterdam, Paris, London or Dublin.

Contracted
0MW
Sovereign by default

EU jurisdiction

Member-state ground. GDPR-native. AI Act-aligned by design — not a compliance retrofit.

Europe
Sovereign
Compute module — assembledCompute module — top cover lifted, copper heatsink revealedCompute module — mid layer lifted, power delivery exposed
02 — The platform

An object built to be operated.

I02.1

Compute

Dense GPU racks, NVIDIA-class silicon, deployed in containerized and greenfield form.

Disassemble
Base
Dense rack interior, copper and steelMacro view of fiber optic strandsHigh voltage substation at twilight
03 — Materials & engineering

What's actually inside.

Three things matter for AI compute: dense hardware, fast networks, cheap power. We build all three together.

01Hardware

Dense GPU racks

Liquid-ready cabinets built for the next generation of NVIDIA chips, not the last.

Hardware
Power
Container data center modules at duskIndustrial corridor at dusk near PlovdivAerial of the future Plovdiv campus footprint at dusk
04 — Trajectory

Three phases. One continuous build.

Phase 0Sofia · Containers

Live

Operational within 6 months

First compute live in Sofia. Containerized, GPU-ready, customer-facing.

Sofia
150 MW
05 — Ecosystem

Built with the operators that build Europe.

Silicon, power, capital and counsel — sourced from the institutions already running continental-scale infrastructure.

NVIDIA
Supermicro
VAST Data
Armada
Trakia Economic Zone
Neterra
ASBIS
Partners
07 — Contact

Already funding infrastructure that compounds? We should talk.

20-min intro · No fund-size questionnaire · No screen at the door

HQ
Sofia · Plovdiv
Jurisdiction
EU member state
Phase 0
Operational < 6 mo
Phase 2
150 MW grid path
© 2026 CoreX
Sofia · BGTEZ Plovdiv · BGinvestors@corexglobal.eu